Aug
08
I have a problem, I made a comp in 25fps and did some animated (and tracked) stuff. The main source is a tiff sequence so I interpreted as 25fps by default.
Now we have to send this project to someone and is has to be 24fps. How can I change this and still having mi animation?
When I re-interpret my footage and change the framerate of the comp the animation ends earlier and my keyframes are not in specific frames (looks like there are in the same "time" as before).
I tryed the scripts rd_CompSetter and ChangeTime_preComp but they didn´t work.
Im using AF CS5.
Thanks in advance for the help
Post a Comment